STOPFENHEIM PROJECT

Stopfenheim Project

The Stopfenheim project, carried out over 45 days in 2021, resulted in a production capacity of 7.5 MWp. Located in Stopfenheim, this project utilizes Suntech STP 440/445 Wp Suntech STP 440/445 Wp panels, recognized for their superior efficiency and ability to capture a large amount of solar energy.

 

Equipped with Huawei Sun 2000 185 KTL Huawei Sun 2000 185 KTL inverters, the project benefits from optimal conversion of solar energy into electricity, ensuring high performance and reliability. This advanced technology configuration enables maximum efficiency and efficient operation, supporting local energy requirements.

Details

2021, 45 days
7,5 MWp
Stopfenheim
Suntech STP 440/445 Wp
Huawei Sun 2000 185 KTL