Project Langenwetzendorf
The Langenwetzendorf project, which started in 2021, ran over a three-week period and resulted in a production capacity of 1.78 MWp. Located in Langenwetzendorf, this project utilizes 310 Wp solar panels, ensuring efficient and constant solar power generation.
310 Wp solar panels are known for their reliability and performance, contributing significantly to the overall efficiency of the project. They capture solar energy and convert it into electricity, supporting local energy needs with a green and sustainable energy source.
Details
2021
3 weeks
1,78 MWp
Langenwetzendorf
310 Wp